At the end of the fiscal year, the variances from standard are usually transferred to the finished goods account.

A) True
B) False

Correct Answer

verifed

verified

  Calculate the fixed factory overhead volume variance using the above information: A)  $1,701 Favorable B)  $4,866.75 Unfavorable C)  $1,701 Unfavorable D)  $4,866.75 Favorable Calculate the fixed factory overhead volume variance using the above information:


A) $1,701 Favorable
B) $4,866.75 Unfavorable
C) $1,701 Unfavorable
D) $4,866.75 Favorable

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

The following data is given for the Harry Company: The following data is given for the Harry Company:   Overhead is applied on standard labor hours. The direct labor time variance is: A)  6,000F B)  6,000U C)  33,000U D)  33,000F Overhead is applied on standard labor hours. The direct labor time variance is:


A) 6,000F
B) 6,000U
C) 33,000U
D) 33,000F

E) C) and D)
F) A) and D)

Correct Answer

verifed

verified

Oak Company produces a chair that requires 6 yds. of material per unit. The standard price of one yard of material is $7.50. During the month, 8,500 chairs were manufactured, using 48,875 yards. Journalize the entry to record the standard direct materials used in production.

Correct Answer

verifed

verified

The Finishing Department of Pinnacle Manufacturing Co. prepared the following factory overhead cost budget for October of the current year, during which it expected to operate at a 100% capacity of 10,000 machine hours: The Finishing Department of Pinnacle Manufacturing Co. prepared the following factory overhead cost budget for October of the current year, during which it expected to operate at a 100% capacity of 10,000 machine hours:    During October, the plant was operated for 9,000 machine hours and the factory overhead costs incurred were as follows: indirect factory wages, $16,400; power and light, $10,000; indirect materials, $3,000; supervisory salaries, $12,000; depreciation of plant and equipment, $8,800; insurance and property taxes, $3,200. Prepare a factory overhead cost variance report for October. (The budgeted amounts for actual amount produced should be based on 9,000 machine hours.) During October, the plant was operated for 9,000 machine hours and the factory overhead costs incurred were as follows: indirect factory wages, $16,400; power and light, $10,000; indirect materials, $3,000; supervisory salaries, $12,000; depreciation of plant and equipment, $8,800; insurance and property taxes, $3,200. Prepare a factory overhead cost variance report for October. (The budgeted amounts for actual amount produced should be based on 9,000 machine hours.)

Correct Answer

verifed

verified

Define nonfinancial performance measures. What are they used for and what are some common examples?

Correct Answer

verifed

verified

Nonfinancial performance measures evalua...

View Answer

If the standard to produce a given amount of product is 1,000 units of direct materials at $11 and the actual was 800 units at $12, the direct materials price variance was $800 favorable.

A) True
B) False

Correct Answer

verifed

verified

A favorable cost variance occurs when


A) Actual costs are more than standard costs.
B) Standard costs are more than actual costs.
C) Standard costs are less than actual costs.
D) None of the above.

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

The total manufacturing cost variance consists of:


A) Direct materials price variance, direct labor cost variance, and fixed factory overhead volume variance
B) Direct materials cost variance, direct labor rate variance, and factory overhead cost variance
C) Direct materials cost variance, direct labor cost variance, variable factory overhead controllable variance
D) Direct materials cost variance, direct labor cost variance, factory overhead cost variance

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

Ideal standards are developed under conditions that assume no idle time, no machine breakdowns, and no materials spoilage.

A) True
B) False

Correct Answer

verifed

verified

The Flapjack Corporation had 8,200 actual direct labor hours at an actual rate of $12.40 per hour. Original production had been budgeted for 1,100 units, but only 1,000 units were actually produced. Labor standards were 7.6 hours per completed unit at a standard rate of $13.00 per hour. Compute the labor rate variance.


A) 4,920U
B) 4,920F
C) 4,560U
D) 4,560U.

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

Though favorable volume variances are usually good news, if inventory levels are too high, additional production could be harmful.

A) True
B) False

Correct Answer

verifed

verified

If at the end of the fiscal year the variances from standard are significant, the variances should be transferred to the:


A) work in process account only
B) cost of goods sold account only
C) finished goods account only
D) work in process, cost of goods sold, and finished goods accounts

E) C) and D)
F) A) and B)

Correct Answer

verifed

verified

The direct labor time variance measures the efficiency of the direct labor force.

A) True
B) False

Correct Answer

verifed

verified

The variance from standard for factory overhead cost resulting from operating at a level above or below 100% of normal capacity is termed volume variance.

A) True
B) False

Correct Answer

verifed

verified

The following data relate to direct labor costs for the current period: The following data relate to direct labor costs for the current period:   What is the direct labor time variance? A)  $36,000 unfavorable B)  $35,000 unfavorable C)  $23,000 favorable D)  $22,000 favorable What is the direct labor time variance?


A) $36,000 unfavorable
B) $35,000 unfavorable
C) $23,000 favorable
D) $22,000 favorable

E) All of the above
F) None of the above

Correct Answer

verifed

verified

The Lucy Corporation purchased and used 129,000 board feet of lumber in production, at a total cost of $1,548,000. Original production had been budgeted for 22,000 units with a standard material quantity of 5.7 board feet per unit and a standard price of $12 per board foot. Actual production was 23,500 units. Compute the material price variance.


A) 0
B) 59,400U
C) 59,400F
D) 6,000U

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

If the standard to produce a given amount of product is 2,000 units of direct materials at $12 and the actual was 1,600 units at $13, the direct materials quantity variance was $5,200 favorable.

A) True
B) False

Correct Answer

verifed

verified

One reason not to depend solely on historical records to set standards is that there may be inefficiencies contained in past costs.

A) True
B) False

Correct Answer

verifed

verified

The following data is given for the Bahia Company: The following data is given for the Bahia Company:   Overhead is applied on standard labor hours. The factory overhead volume variance is: A)  $65U B)  $65F C)  $540U D)  $540F Overhead is applied on standard labor hours. The factory overhead volume variance is:


A) $65U
B) $65F
C) $540U
D) $540F

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

Showing 141 - 160 of 161